Finishing the cleaning
Thursday 29 July 2011
On site: Keith Fitzpatrick-Matthews, William Peters, Julie Goodwin, Sid Rowe, Henry Marshall, Caoimhín Ó Coiléain, Philip Dean, Siân O’Neill, Nick Smith, Tony Driscoll
Weather: sunny, hot, slight breeze; becoming cloudier after midday
Despite a weather forecast promising overcast skies, there’s barely a wisp of cloud and we’re already 22° C. As the work today is largely heavy (hoeing, moving spoilheaps, clearing vegetation etc.), people will need to be careful to use sunblock and drink plenty of water.
The weathering of the exposed surface in Trench IV makes it clear that we do indeed have a ditch on this side. There are also distinct bands visible inside the bank, allowing an assessment to be made of its construction.
By lunchtime, all of Tr IV has been cleaned, the vegetation around both trenches removed, the spoilheaps cleared back and work started on taking the backfill off the geotextile. Better progress than I’d hoped in this heat and humidity!
I’ve redone the matrix for last year’s Tr I and found that I’d missed assigning a context to a chalk deposit seen in section. All done now, so we’re ready to start assigning contexts to Tr IV.
There’s a lot of dust on the surface of the bank, so it will need to be brushed carefully. That way, we ought to be able to distinguish between the separate dump horizons.
Filed under: Fieldwork, Stapleton’s Field Dig 2011